June 10, 2021
The equipment Cone Calorimeter is ready to Italy in May,2021.
IG's chinese staffs inspect our goods,especially for the temperature and insulation.
![]()
![]()
According to their requirements,we made some changes ,such as:
1.isolation should be done between different voltage conductor.
![]()
2.Replace EU type plugs or sockets.
![]()
3.Add protection net for opening of fan.
![]()
4.Protection cover is added to prevent high temperature.
![]()
After two weeks rectification,we finally get their approval and affix the CE mark.